Validation

It computes what the textbooks compute

Fast is only useful if it is right. We run open problems with published or exact answers and put our numbers next to them. Most open as a project in the trial.

  • Queues and factory physicsWaiting times and throughput match the analytical answers: Erlang C, Factory Physics' Penny Fab, CONWIP curves.
  • Line balancingReaches all 13 published optimal station counts in the Scholl SALBP-1 sets.
  • Scheduling and fabsReplays the known optimal FT06 schedule; Intel Mini-Fab makes 83.6 of 84 lots a week; SMT2020 at full scale lands within 3% of the published cycle times.
ProblemPublished / exactMachsizer
Three parallel servers, Erlang CQueueing theory, M/M/3lead time 2.079 h2.066 h
Penny Fab Two, open networkHopp & Spearman, Factory Physics, ch. 730.52 h · WIP 9.1630.50 ± 1.33 h · WIP 9.2
Penny Fab One under CONWIPFactory Physics, ch. 7 · WIP 1 / 4 / 120.1250 / 0.2857 / 0.4000 per h0.1250 / 0.2842 / 0.3999 per h
Line balancing, Jackson and GuntherScholl SALBP-1 data sets · 13 cycle timesoptimal station counts13 of 13 optimal
Intel Mini-Fab, re-entrant flow with batchesKempf 1994 · release 84 lots / week84 lots / week83.6 lots / week
Job shop FT06Fisher & Thompson 1963, OR-Libraryoptimal makespan 5555 on the optimal schedule
SMT2020 semiconductor fabKopp et al. 2020, dataset 1 (HVLM) · 1,443 tools · up to 583 steps · year two of two, five seeds · cycle time of all lots, published by AutoSched · not in the trial1,227 h / 681 h1,258 ± 21 h / 683 ± 12 h
Exact answers are computed independently, never from our own output.

Try it on your own product.